Analytics & Intelligence
LIVE
--:--:--
DC
DC Manager

Analytics & Intelligence

AI-POWERED
1.42
Average PUE (30 days)
Improved from 1.48 last month
99.2%
Uptime SLA (30 days)
+0.3% vs last month
Rp 847M
Energy Cost (30 days)
-Rp 42M vs last month
68%
Avg Rack Utilization
Same as last month
PUE Trend — 12 Months
Energy Cost — 12 Months (Rp Juta)
Capacity Planning — Current vs Limit
IT Power Load
71%
Rack Space
68%
Cooling Capacity
82%
UPS Capacity
67%
Network Bandwidth
54%
Floor Space (m²)
73%
Genset Capacity
78%
AI Capacity Forecast
At current growth rate (8%/year), cooling capacity will hit 90% by Q3 2027. Recommend CRAC expansion planning in Q1 2027.
Predictive Maintenance Queue
DevicePredictionConfidenceDays LeftAction
UPS-B12
Battery
Battery replacement needed
85%
3 days
CRAC-A07
Compressor
Compressor bearing wear
72%
8 days
GEN-03
Engine Oil
Oil change interval due
68%
11 days
CRAC-B05
Filter
Air filter replacement
61%
18 days
UPS-A04
Capacitor
Capacitor aging detected
55%
24 days
Power Distribution
Top Energy Consumers
AI Insights
PUE Improvement
PUE dropped from 1.48 to 1.42 (4% improvement) after CRAC setpoint optimization last month. Estimated saving: Rp 42M/month.
Cooling Hotspot Pattern
Row B Column 6-8 consistently runs 2-3°C hotter than adjacent racks. Consider relocating high-density workloads or adding targeted cooling.
Peak Load Pattern
Power demand peaks at 09:00-11:00 and 14:00-16:00 on weekdays. Staggered startup schedule could reduce peak by ~180kW.
UPS Runtime Forecast
At current battery degradation rate, UPS-B12 will fall below 10% capacity within 3 days. Immediate replacement recommended.
MTTR Trend by Category (Minutes)
System Availability — 12 Months (%)