DUAL APPROVAL REQUIRED PDU Outlet Control
PDU-A01 — Row A
● Online
Load: 72%
Curr: 18.4A
Volt: 228V
PDU-A03 — Row A
● Load High
Load: 85%
Curr: 21.2A
Volt: 229V
PDU-B02 — Row B
● Online
Load: 58%
Curr: 14.6A
Volt: 227V
PDU-C01 — Row C
● Online
Load: 63%
Curr: 15.8A
Volt: 230V
ATS Control
ATS-01 — Main
● PLN Active
Source A: PLN 229V
Source B: Genset (Standby)
UPS Control
UPS-A01
● Online
Bat: 94%
Load: 68%
UPS-B12
● Batt Crit
Bat: 18%
Load: 71%
Genset Control
GEN-01 (Volvo 2MW)
● Standby
Fuel: 82%
Temp: 68°C
GEN-03 (Perkins 1.5MW)
● Standby
Fuel: 28%
Temp: 65°C
CRAC Control
CRAC-A07
● Temp High
Set: 22°C
Supply: 27.8°C
CRAC-B05
● Running
Set: 22°C
Supply: 21.8°C
Alert Threshold Config
Temperature Critical
Default: 35°C
°C
Temperature Warning
Default: 30°C
°C
UPS Battery Critical
Default: 20%
%
PDU Load Warning
Default: 80%
%
Humidity Critical High
Default: 70%
%
Genset Fuel Low
Default: 30%
%
Approval Queue (3 Pending)
PDU-A03 Load Shed — Outlet 7 & 8
Pending
High load condition on PDU-A03. Request to shed non-critical outlets 7 and 8 to reduce load below 80%.
Operator Requested
Supervisor Approval
PIN Confirm
CRAC-A07 Setpoint Change 22°C → 20°C
Pending
Hot spot in Row B Col 7. Reduce CRAC-A07 setpoint to increase cooling capacity.
Operator Requested
Supervisor Approval
GEN-03 Test Run — 30 minutes
Pending
Monthly test run for GEN-03 per PM schedule WO-2841.
Tech Requested
Supervisor Approval
PIN Confirm
Command History (Today)
| Time | Command | Target | By | Approver | Result |
|---|---|---|---|---|---|
| 14:07:22 | CRAC Setpoint | CRAC-B03 | Siti R. | Budi S. | Success |
| 13:55:14 | Outlet Power Cycle | PDU-C02 #4 | Dewi K. | Hendra W. | Success |
| 13:22:04 | ATS Test Transfer | ATS-01 | Ahmad F. | Budi S. | Success |
| 12:44:18 | UPS Battery Test | UPS-A03 | Rudi H. | Hendra W. | Success |
| 11:33:07 | Genset Test Run | GEN-02 | Hendra W. | Budi S. | Success |
| 10:15:44 | CRAC Setpoint | CRAC-A04 | Siti R. | Budi S. | Timeout |
| 09:22:31 | Outlet OFF | PDU-B01 #7 | Ahmad F. | — | Rejected |