Reporting Center
LIVE
--:--:--
DC
DC Manager

Reporting Center

AUTO-GENERATE
Report Templates
Daily Operations
24-hour operations summary: alerts, uptime, power, cooling, incidents
PDF XLSX
Monthly Energy Report
PUE analysis, power consumption, cost breakdown, efficiency trend
PDF XLSX CSV
Monthly Alert Report
Alert statistics, MTTR, SLA compliance, top recurring issues
PDF XLSX
Maintenance Report
WO completion, PM compliance, spare parts usage, maintenance cost
PDF XLSX
Capacity Planning
Current utilization, growth forecast, runway calculation, recommendations
PDF XLSX
Security Audit Report
Access events, denied attempts, rack door status, camera incidents
PDF XLSX
Uptime & SLA Report
System availability, incident timeline, SLA breaches, RTO/RPO metrics
PDF XLSX JSON
Custom Report Builder
Build custom report with drag-and-drop sections, filters, date ranges
PDF XLSX CSV JSON
Quick Generate
Report Preview (Daily Ops — March 7, 2026)
DC-IMS Daily Operations Report 7 March 2026
Executive Summary
Overall system health: NORMAL | Uptime: 99.2% | PUE: 1.42

Alerts (24h)
Total alerts generated: 254 | Critical: 3 | High: 8 | Resolved: 247
Average MTTR: 8.4 minutes

Power
Total consumption: 67.2 MWh | IT Load: 2.84 MW avg | Cost est.: Rp 28.2M

Cooling
Avg supply temp: 21.4°C | COP: 4.2 | pCUE: 0.36
1 hot spot detected: Row B Col 7 @ 34.2°C

Incidents
• UPS-B12 battery critical (18%) — Ongoing
• Rack door B-03 forced open — Under investigation
Scheduled Reports
Daily Operations Report
Daily 07:00 → Email: noc@datacenter.id, ops@datacenter.id
Next: 2026-03-08 07:00
Weekly Energy Report
Monday 08:00 → Email: management@datacenter.id
Next: 2026-03-09 08:00
Monthly SLA Report
1st of month 06:00 → Email: board@datacenter.id + PDF
Next: 2026-04-01 06:00
Monthly Alert Summary
1st of month 07:00 → Email: supervisor@datacenter.id
Next: 2026-04-01 07:00
Monthly Maintenance Report
1st of month 08:00 → Email: maintenance@datacenter.id
Next: 2026-04-01 08:00
This Month Stats
Reports Generated
47
Auto-Scheduled
36
Manual Requests
11
Emails Sent
124
Report Archive
Report NameTypePeriodFormatGeneratedGenerated BySizeAction
Daily Ops — Mar 7, 2026 Operations 2026-03-07 PDF 07:00:12 Scheduled 2.4 MB
Daily Ops — Mar 6, 2026 Operations 2026-03-06 PDF 07:00:08 Scheduled 2.1 MB
Monthly Energy — Feb 2026 Energy 2026-02-01 ~ 02-28 XLSX 2026-03-01 06:00 Scheduled 5.8 MB
Monthly Alert — Feb 2026 Alert 2026-02-01 ~ 02-28 PDF 2026-03-01 07:00 Scheduled 3.2 MB
Security Audit — Q4 2025 Security 2025-10 ~ 12 PDF 2026-01-02 10:22 DC Manager 4.7 MB
Capacity Planning — 2026 H1 Capacity 2025-12 ~ 2026-06 XLSX 2026-01-15 14:33 DC Manager 8.2 MB