Maintenance CMMS
CMMS4
Open WO
3 due today
7
In Progress
2 SLA at risk
48
Completed (Month)
SLA: 94.7%
8.4m
Avg MTTR
-1.2m vs last month
Rp 84M
Maint Cost (Month)
Budget: Rp 100M
Work Orders — Active
4 Open
7 In Progress
WO-2847
CRAC-A07 Compressor Inspection
CRITICAL
WO-2849
Water Leak Investigation — Row C Floor
HIGH
Progress60%
WO-2841
GEN-03 Monthly Test Run
MEDIUM
Progress80%
WO-2851
[AI] Predicted PM: UPS-B12 Battery
DRAFT
PM Schedule — March 2026
Sen
Sel
Rab
Kam
Jum
Sab
Min
24
25
26
27
28
1
GEN Test
2
3
UPS Inspect
4
Filter Clean
5
6
ATS Test
7
CRAC Insp
WL Check
8
9
10
Fire Test
11
Bat Replace
12
13
14
15
Checklist — WO-2841 GEN-03 Test
Pre-start inspection: oil, coolant, fuel levelHendra
Start engine — verify RPM stable at 1500Hendra
Load test: apply 50% load via resistor bankHendra
Monitor: voltage 400V ±2%, freq 50Hz ±0.5HzHendra
Run 30-minute full load test—
Record: fuel consumption rate—
Cool-down period 10 minutes—
Post-test: check for leaks, abnormal sounds—
Spare Parts Inventory
2 Low Stock
UPS Battery 12V 150Ah
1
CRAC Air Filter G4
3
Genset Engine Oil 20W-50
30L
PDU Power Cable 16A
12
Water Leak Sensor Cable
4
UPS Fuse 63A
8
Vendor Management
| Vendor | Type | Rating | Contract |
|---|---|---|---|
| PT Teknindo Prima +62-21-5551234 |
Service | ★★★★★ | Valid 2027 |
| CV Jaya Teknik +62-21-5559876 |
Supplier | ★★★★★ | Valid 2026 |
| PT Volvo Genset ID +62-21-5554321 |
Service | ★★★★★ | Exp 2026-09 |
| Daikin Service ID +62-21-5557890 |
Service | ★★★★★ | Valid 2027 |
| PT Eaton Indonesia +62-21-5552222 |
Both | ★★★★★ | Exp 2026-04 |
Maintenance Cost (Rp Juta)
Parts: Rp 42M
Labor: Rp 28M
Vendor: Rp 14M
SLA Compliance — March 2026
94.7% Overall
| Priority | SLA Target | Total WO | Within SLA | Breached | Compliance | Avg MTTR |
|---|---|---|---|---|---|---|
| Critical | 4 hours | 8 | 8 | 0 | 100% | 1h 48m |
| High | 8 hours | 19 | 18 | 1 | 94.7% | 3h 24m |
| Medium | 24 hours | 14 | 14 | 0 | 100% | 6h 12m |
| Low | 72 hours | 7 | 6 | 1 | 85.7% | 18h 45m |